Sample Inspection Report

See exactly what you'll receive. This anonymized example shows the detail, clarity, and actionable findings in a typical B4TheyGo inspection report.

Report Header

Property Address

123 Example Street

Springfield, IL 62701

Inspection Details

Date: March 15, 2026

Time On-Site: 2.5 hours

Inspector: Licensed Construction Professional

Project Type: New Construction Home

📋 Scope & Disclaimer

This inspection focuses on visible conditions only. We document construction quality, finish completeness, and operational systems. We do not perform structural engineering assessments, code compliance audits, or destructive testing. This report is for informational purposes to support homeowner decision-making before final contractor payment.

Summary by Category

✓ No Issues

4

⚠ Minor Items

7

🔴 Notable Issues

2

Overall Finding: The home is substantially complete with minor punch-list items typical of new construction. Two notable issues warrant contractor attention before final payment release.

Detailed Findings

📍

Exterior & Landscaping

✓ Roof Installation Complete

Shingles properly installed and secured. No visible gaps, missing fasteners, or lifting. Flashing properly sealed at all penetrations.

⚠ Minor: Exterior Caulking Gaps

Small gaps visible where siding meets trim on east elevation. Recommend contractor review and seal prior to final handoff. This is cosmetic but will prevent water intrusion if left open through winter.

🔴 Notable: Grading Slope at Foundation

Grade slopes toward foundation on northwest corner, creating potential water accumulation risk. Recommend contractor regrade this area to slope away from home and install proper drainage or swale.

Recommendation: Request contractor correct before final payment. Cost typically $500–$1,500 depending on scope.

🏗

Foundation & Structure

✓ Foundation Solid, No Visible Cracks

Basement walls and floor show no structural cracks or settlement indicators. Concrete appears well-cured.

⚠ Minor: Basement Penetration Gaps

Where electrical and plumbing lines penetrate the foundation, there are small unsealed gaps. Recommend silicone sealant to prevent pest entry.

Mechanical Systems

✓ HVAC System Operational

Furnace fires cleanly. Air conditioning cycles properly. Thermostat responds. Filter installed and system ready for occupancy.

⚠ Minor: Ductwork Documentation

HVAC system functional, but homeowner should request contractor provide system schematic, filter size, and maintenance schedule before taking possession.

🚰

Plumbing

✓ Water Supply, Pressure, & Drainage All Functional

All fixtures drain properly. Water pressure normal. No visible leaks under sinks or at toilet seals.

⚠ Minor: Bathroom Caulking

Shower/tub surround caulk incomplete in master bath. Recommend contractor seal all joints with waterproof silicone prior to final payment.

Electrical

✓ Power Distribution & Outlets Operational

Main panel properly labeled. All outlets tested and functional. GFCI protection verified in bathrooms and kitchen.

⚠ Minor: Cover Plates Missing

Three outlet/switch cover plates not yet installed. Contractor should complete before final walkthrough.

🔴 Notable: Light Fixture in Master Bedroom Incomplete

Ceiling box roughed in but fixture not installed. Electrical connection present but not terminated to fixture.

Recommendation: Request contractor complete fixture installation and verify operation before final payment.

🎨

Interior Finishes

✓ Paint & Drywall Finished

All walls and ceilings painted. No visible drywall damage. Trim finish consistent throughout.

⚠ Minor: Flooring Gaps & Trim

Base trim installation incomplete in hallway. Small gaps visible at transitions between tile and hardwood. Recommend contractor seal for moisture prevention.

⚠ Minor: Paint Touch-Up

Two small areas in kitchen show paint inconsistency. Request contractor do final touch-up pass on all walls and trim.

Summary & Recommendations

This home is substantially complete and ready for occupancy with minor corrections. Two issues—grading and light fixture completion—warrant attention before final payment release.

Negotiation Points: Use this report to request contractor:

  • Correct northwest foundation grading (notable issue)
  • Complete master bedroom light fixture (notable issue)
  • Seal caulking gaps (exterior and bathroom)
  • Complete base trim and flooring sealing (hallway)
  • Final paint touch-up pass

Most contractors will address these items within 1–2 weeks. Request written confirmation of corrections and schedule a brief follow-up walk-through before releasing final payment.

Report Prepared By: B4TheyGo Construction Consulting

This report is confidential and intended only for the property owner and their authorized representatives.

Ready to Protect Your Investment?

Get a detailed inspection before your contractor's final payment deadline. Catch issues while you have leverage.